Equipment and Facilities Catalogue

*********************************************************************

LIFT Holiday Closure 2024
LIFT’s facility will be closing on Thursday, December 19, 2024 at 4:00pm ET and will reopen on Tuesday, January 7, 2025 at 10:00am ET.

Full Closure Details:
https://lift.ca/news-post/lift-office-and-store-holiday-closure-december-2024

*********************************************************************

Lowel Interlink Connector #1

Lowel Interlink Connector #1 Lowel Interlink Connector #1
Interconnects various components. Adds multiple mounting positions; allows for mounting in straight line or at right angles (90°). Both studs are removable and have a 1/4-20 threaded hole to simplify mounting accessories with 1/4-20 bolts.

Rates:

Per day: $1
Per week: $4